Traffic Electronic Detection Systems (EDS)

 

 

Traffic Electronic Detection Systems (EDS) is a business in which the General Directorate of Security is in charge of the work of the General Directorate of Security and this work is included in the Article 16 of the Highway Traffic Law No 2918 as a construction work. In this context, the Municipalities perform the installation, assembly and commissioning of these systems; Minimum 5 years Maximum 25 years with delivery of the system to the Security Units maintenance, repair and operation services. The municipality will receive a 30% share from the penalties incurred until the cost of investment is achieved, after cost of investment achieved, the share decreases to 15%. If the municipalities have their own budget, the municipalities operate it themselves. If the municipality does not have a budget, it goes to the tender without making any payment and 30%-15% share is distributed between municipality and the contractor with a model similar to Build-Operate-Transfer (BOT) model. This business is not a Public-Private-Partnership (PPP) model.

 

Our main objectives are;

 

There are total 62 EDS locations in Turkey, currently 30 of them are installed and being operated, others will be opened in a short time. 11 of these 62 locations are operated by the Municipalities themselves. In the remaining 51 locations, 45 of them are in our purchasing list.

 

The summary of this work is actually the getting EDS contracts from the current operators. At present, for 45 locations, total cost is 685.000.000 TL. In addition to this cost, and investment around 100.000.000 TL should be considered for company establishment, general costs of company should be covered in order to maintain sustainability until the EDS income starts to flow in (this period is around 6 Months). Thus, total of 785.000.000-TL (approx. 110.000.000-USD $ / 100.000.000-EURO ) initial investment should be considered. According to the 30%-15% share of the proposed structure, the investment is recovered roughly in 24-36 months (including taxes). The remaining 7-8 years are considered as income. In Turkey or in any other countries at the moment no business model with such high ROI. IRR is 32%

 

This is an estimation, based on past experience, and it does not give 100% precise results.

All the details, information and data about these subjects are presented to you with the following file names.


All Files Directly Link
https://www.dropbox.com/sh/ypu4hpqbc0l90s0/AAAdUcfhnqv9HlJpcLNhX3Nxa?dl=0



1.      EDS Presentation
⦿ Presentation with detailed information about procedures, operations of EDS, technical information and statement of EDS locations in Turkey.
https://www.dropbox.com/s/955s3d8jlyt9ere/01.skyplus.eds.presentation.en.ppsx?dl=0
**please download the presentation file because the file size is high.
⦿ PDF File.
https://www.dropbox.com/s/sbgvmupivulxxic/01.skyplus.eds.presentation.en.pdf?dl=0


2.      Road Map for one EDS Location
⦿ Step-by-Step road map plan showing the time intervals and tasks to be performed in order to establish the entity for investment and operation of EDS.
https://www.dropbox.com/s/c2s6spp4nqmun9w/02.bp.rm.pdf?dl=0

3.      Consolidated Cash Flow Chart
⦿ Chart showing costs, income, ROI of the project on annual basis

Cash Flow Chart (TL)
https://www.dropbox.com/s/jxx5hjps8s31h9e/03.consolidated.cash.flow.chart.TL.pdf?dl=0

Cash Flow Chart (TL) Trends
https://www.dropbox.com/s/j7j10r4cq9rj2ws/03.consolidated.cash.flow.chart.TL.Trends.pdf?dl=0

Cash Flow Chart (USD)
https://www.dropbox.com/s/0lh9w5fhn7c0yf4/03.consolidated.cash.flow.chart.USD.pdf?dl=0

4.      List of EDS locations to be purchased.
⦿ List of Sale prices of EDS Locations for sale and their statements.
https://www.dropbox.com/s/lzsn6341mq4xb45/04.sales.eds.pdf?dl=0

5.      EDS Feasibility Report Sample

⦿ Estimated revenue information based on a 30%-15% share of a sample location. This sample shows how each EDS location income is forecasted.

Ps: The yellow cells in the given document are changeable areas, so they can be modified if demanded.
https://www.dropbox.com/s/hrahyw3bppinzxs/05.eds.feasibility.report.xlsx?dl=0

6.      New Entity Responsibility Matrix

⦿ Responsibility distribution for each party on the new EDS entity/company.
https://www.dropbox.com/s/czqqzav72hd72ro/06.responsibility.pdf?dl=0

7.      Map of Active EDS Locations

⦿ Distribution of active EDS locations from General Directorate of Security official website
https://www.dropbox.com/s/klojzg7j2ftldw7/07.egm.eds.pdf?dl=0
https://onlineislemler.egm.gov.tr/trafik/Sayfalar/EDSHarita.aspx

8.      Map of Road Traffic Density in Turkey (2020)
https://www.dropbox.com/s/rmafynzlbaps889/08.kgm.tck.yogt.pdf?dl=0

9.      Speed Limits in Turkey
⦿ Speed limits determined according to vehicle type and structure of the road in accordance
https://www.dropbox.com/s/g9patefv740zaky/09.egm.limit.pdf?dl=0


10.      Recommended Company Organization Chart
https://www.dropbox.com/s/g50pnsts4vcwfd0/10.organization.chart.pdf?dl=0

 

More detailed information can be shared if requested.

Best regards;

 

 

Kaan YORGA
General Manager (Advisor)
sky+ Consulting Services Inc
 


Altayçeşme Mah. Öz Sok. Gold Plaza No:19 Kat:12
34843, Maltepe/İstanbul

t.

+90 (216) 499 40 40

f.

 +90 (216) 420 69 16

m.

+90 (532) 418 49 50

   

kaan.yorga@skyplus.tc


www.skyplus.tc

İSTANBUL ANKARA İZMİR BODRUM



hitwebcounter